ADU Builder in Granada Hills
Detached ADUs and garage conversions across Granada Hills. Big lots, horse-keeping properties, and hillside parcels north of the 118 are exactly where a backyard unit pays off, and where the details matter most.
EMR Heritage Build Co. builds ADUs in Granada Hills, with a focus on detached backyard units that use the area's larger lots. We pull the LADBS permit, place the unit around horse-keeping and hillside constraints, and build to fire-zone standards where the parcel requires it. Starter pricing runs roughly $75,500 to $239,000 depending on the type of unit. CSLB #1156160.
How much does an ADU cost in Granada Hills?
About 400 sq ft. Converts an existing garage into a permitted unit.
About 750 sq ft, built new in the backyard.
About 300 sq ft of attached new living space.
Can you build a detached ADU on a Granada Hills lot?
Usually, and often a larger one than owners expect. Granada Hills is City of Los Angeles, so the ADU runs through LADBS under California state ADU law. The ranch-style lots north of the 118 often have room for a full detached unit with its own yard and approach, without crowding the main house.
A detached ADU up to 1,200 square feet is allowed under Gov. Code 66314, and an 800 square foot unit is allowed by right under 66323, with side and rear setbacks as small as 4 feet.
No impact fees at 750 square feet or less. An ADU with 750 square feet or less of interior livable space pays no development impact fees (Gov. Code 66311.5), which is why many owners size right at that line.
No owner-occupancy requirement for a standard ADU, so the unit can be rented from day one.
What about horse-keeping lots in the K district?
Part of Granada Hills north of the 118 sits in the Granada Hills–Knollwood Equine Keeping District, the city's "K" overlay for properties that keep horses. These lots are large, and state law still allows an ADU on them.
The real question is placement. LADBS spaces horse enclosures in a "K" district at least 35 feet from habitable rooms on the same lot, and an ADU is habitable space. Corrals, stables and riding access also take up the usable flat pad. We lay the ADU out so it works with the horse facilities instead of against them, and confirm the overlay rules for your parcel before design.
Do Granada Hills ADUs need fire-zone construction?
On many northern parcels, yes. The foothills toward the Santa Susana Mountains fall inside the Very High Fire Hazard Severity Zone. A new detached ADU there must be built to California fire-hardened standards under CBC Chapter 7A: Class A roofing, dual-pane tempered glass, ember-resistant vents, and defensible-space clearance.
We check your parcel against the LAFD fire-zone map before pricing, so that work is in the estimate from the start. Lots south of the 118, in the postwar tract neighborhoods, usually fall outside the zone.
How long does ADU approval take in Granada Hills?
LADBS must approve or deny a complete ADU application within 60 days under Gov. Code 66317, with no public hearing or discretionary design review if the plans meet objective standards. Hillside, "K" district and fire-zone parcels need a more careful first submittal, so we build it complete up front to keep that clock moving.
Why Granada Hills owners work with EMR Heritage
We plan for the lot you actually have.
"K" district spacing, hillside access, and fire-zone materials are scoped before you see a number.
A written scope before you commit.
An itemized written scope within 2 business days of your free design consultation.
Licensed and insured.
Class B general contractor, CSLB #1156160, general liability insured.
A real warranty.
One-year written workmanship warranty from substantial completion.
Granada Hills ADU questions
Can I build an ADU on a horse property in Granada Hills?
How big can a detached ADU be in Granada Hills?
How much is an ADU in Granada Hills?
Is my Granada Hills lot in a fire zone?
Find out what fits on your Granada Hills lot
Send us your address. We check the "K" district, the fire zone, and the permit path, then send a written estimate range within 2 business days.
Before you build: related reading
Attached versus detached ADUs in Los Angeles: 2026 cost bands, utility and fire-separation issues, permits, and lot questions to settle before...
October 4, 2026How to Prepare ADU Plans for Los Angeles HomesHow to prepare ADU plans for Los Angeles: 8 documents, 60-day state review rule, and the site facts that prevent costly plan corrections before...
August 28, 2026Junior ADU Eligibility Requirements in California (2026 Rules)California JADU rules changed on January 1, 2026. Owner occupancy is now conditional. Here are the current eligibility tests, with the code...
