ADU Builder in Santa Clarita
Garage conversions and detached ADUs across Santa Clarita, including Valencia, Saugus, Canyon Country and Newhall. Different permit office from Los Angeles, HOAs on most streets, and hillside lots: we plan for all three.
EMR Heritage Build Co. builds ADUs across the City of Santa Clarita. Your permit goes through the city's own Building & Safety Division, not LADBS, and most Valencia streets add an HOA review. We handle both and build to fire-zone standards where the lot requires it. Starter pricing runs roughly $75,500 to $239,000 depending on the type of unit. CSLB #1156160.
How much does an ADU cost in Santa Clarita?
About 400 sq ft. Converts an existing garage into a permitted unit.
About 750 sq ft, built new in the backyard.
About 300 sq ft of attached new living space.
Who issues the ADU permit in Santa Clarita?
For an address inside the City of Santa Clarita, the building permit comes from the city's Building & Safety Division on Valencia Boulevard, not from LADBS. The fire code is enforced separately by LA County Fire Prevention, and sewer connections go through the LA County Sanitation District.
Unincorporated areas such as Stevenson Ranch and Castaic are not in the city at all and permit through LA County instead. We confirm which agency has your parcel before design, so the plans are drawn to the right office's requirements from the start.
Can my HOA stop me from building an ADU?
No. Under California Civil Code 4751, any HOA rule that effectively prohibits or unreasonably restricts an ADU on a single-family lot is void and unenforceable, and Civil Code 4741 bars an HOA from prohibiting you from renting it. That matters in Valencia and the other master-planned neighborhoods, where most homes sit under an HOA.
An HOA can still apply reasonable rules, such as architectural review of materials and colors. We run HOA review alongside the city permit so neither one holds up the other.
Do Santa Clarita ADUs need fire-zone construction?
Many hillside parcels do. Large parts of the Santa Clarita Valley sit in Very High Fire Hazard Severity Zones, and a new detached ADU there has to meet CBC Chapter 7A: Class A roofing, dual-pane tempered glass, ember-resistant vents, and defensible-space clearance, with LA County Fire reviewing the fire code. Hillside lots can also trigger grading and drainage review. We check all of it before pricing.
What can you build on a Santa Clarita lot?
State ADU law sets the floor in Santa Clarita just as it does in Los Angeles, and the 60-day ministerial review under Gov. Code 66317 applies to the city too.
A detached ADU up to 1,200 square feet is allowed under Gov. Code 66314, and an 800 square foot unit is allowed by right under 66323, with side and rear setbacks as small as 4 feet.
No impact fees at 750 square feet or less. An ADU with 750 square feet or less of interior livable space pays no development impact fees (Gov. Code 66311.5), which is why many owners size right at that line.
No owner-occupancy requirement for a standard ADU, so the unit can be rented from day one.
Why Santa Clarita owners work with EMR Heritage
We know the permit split.
City Building & Safety, LA County Fire, and the sanitation district are sequenced from the start.
HOA-ready plans.
We prepare the architectural review package alongside the permit set.
Licensed and insured.
Class B general contractor, CSLB #1156160, general liability insured.
A written scope before you commit.
An itemized written scope within 2 business days of your free design consultation.
Santa Clarita ADU questions
Does Santa Clarita use LADBS for ADU permits?
Can a Valencia HOA block my ADU?
How much is an ADU in Santa Clarita?
Can I rent my Santa Clarita ADU?
Get a straight number on your Santa Clarita ADU
Send us your address. We confirm the permit office, the HOA, and the fire zone, then send a written estimate range within 2 business days.
Before you build: related reading
Santa Clarita ADU setbacks: 4-foot side and rear rules, conversion exceptions, fire review, and the plan checks needed before any construction...
October 28, 2026Attached Versus Detached ADUs: Which Fits?Attached versus detached ADUs in Los Angeles: 2026 cost bands, utility and fire-separation issues, permits, and lot questions to settle before...
November 1, 2026California Progress Payment Schedule: Pay by MilestoneCalifornia progress payment schedule rules cap deposits at $1,000 or 10%. See a milestone draw example for a Los Angeles ADU and what to verify before...