Call us(818) 812-0735 Free Estimate
ADUsKitchensBathroomsService AreasFinancingBlogContactCall (818) 812-0735Get My Free Estimate Range

Home  /  Blog  /  Article

August 30, 2026

Bathroom Remodel Written Scope: What California Law Requires

Short answer: in California, any home improvement contract over $500 has to be in writing, and Business and Professions Code 7159 dictates what has to be in it. Your down payment cannot exceed $1,000 or 10% of the contract price, whichever is less. Your contractor cannot request or accept a payment larger than the value of work already performed. Change orders have to be in writing and signed before the extra work starts. Violating the payment rules is a misdemeanor.

Most articles about bathroom remodel scopes are a list of good intentions. This one is the legal checklist, plus the parts a competent scope adds on top of it, plus what a Los Angeles bathroom permit actually covers.

I am Carlos Vasquez, owner of EMR Heritage Build Co., CSLB #1156160. You can check that license here, and you should check any contractor's before you read their proposal.

Part 1: what the law puts in your contract

These are not preferences. They are B&P Code 7159 requirements, and a contract missing them is defective.

Identification and delivery

  • Contractor's name, business address, and license number. A licensee has to put the license number in contracts and in all advertising (B&P 7030.5).
  • The date you signed, and, since January 1, 2026, the contractor's email address on the first page (AB 1327).
  • You get a copy of the signed, dated contract before any work begins. Your cancellation clock starts when you receive it.

Money

  • Heading "Contract Price," with the amount.
  • Heading "Downpayment," carrying in 12-point boldface: the down payment may not exceed $1,000 or 10 percent of the contract price, whichever is less. The operative prohibition is B&P 7159.5(a)(3).
  • Heading "Schedule of Progress Payments," describing each phase of work, the type and amount of work in each phase, and the amount of each payment. It must carry the warning that it is against the law for a contractor to collect payment for work not yet completed or materials not yet delivered (CSLB progress payment bulletin, PDF).
  • "Finance Charge," if there is one.

Scope and schedule

  • Heading "Description of the Project and Description of the Significant Materials to be Used and Equipment to be Installed."
  • "Approximate Start Date" and "Approximate Completion Date," plus a statement about substantial commencement.
  • A list of documents incorporated into the contract. This is where your plans, allowances, and selections belong.

Changes

  • A change order form incorporated into the contract, and the heading "Note About Extra Work and Change Orders." A change order is not enforceable unless it identifies the scope of the change, the amount added or subtracted, and the effect on the payment schedule or completion date. Extra work performed before a written authorization is signed is at the contractor's risk.

Insurance disclosure

  • Heading "Commercial General Liability Insurance (CGL)," stating whether the contractor carries it, and if so the carrier name and a phone number you can call to verify.
  • Heading "Workers' Compensation Insurance," stating either that the contractor has no employees and is exempt, or that coverage is carried.

Read that second one carefully, because it is the most misunderstood item in the trade. CSLB does not require a general contractor to carry general liability insurance. It requires the contractor to disclose whether they carry it (CSLB CGL guide, PDF). What CSLB requires is a $25,000 contractor's bond, which is a surety instrument, not insurance, and is not there to make you whole on a bad job.

On workers' compensation, ignore anything you read saying every California contractor must carry it as of January 1, 2026. SB 1455 moved that universal mandate to January 1, 2028. Today it is required for contractors with employees and for C-8, C-20, C-22, C-39, and C-61/D-49 licensees regardless (CSLB workers' comp page).

Warnings

  • A "MECHANICS LIEN WARNING" explaining that unpaid subcontractors and suppliers can lien your home. Related: a claimant generally must serve a preliminary notice within 20 days of first furnishing work (Civil Code 8204). A late notice does not kill lien rights, it limits them to the 20 days before service and after (CSLB homeowner lien guide, PDF).
  • A CSLB notice with www.cslb.ca.gov and 800-321-CSLB.

New for 2026: subcontractors

  • SB 517, effective January 1, 2026, adds a yes/no checkbox disclosing whether subcontractors will be used, and if yes, a disclaimer that a list of subcontractors with names, contact information, license numbers, and classifications will be provided on request. The same disclaimer has to appear on each change order (B&P 7159(e)(7)).

If you work with a general contractor who coordinates licensed trades, ask for that list. You are entitled to it.

Your right to cancel

  • Three business days for a contract not negotiated at the contractor's place of business.
  • Five business days if you are 65 or older.
  • Seven business days for repair or restoration of a residence damaged by a sudden or catastrophic event where a state of emergency was declared.
  • Since January 1, 2026 you may cancel by email, and the contract must include a phone number you can call for help completing the cancellation form (AB 1327).

Part 2: what a competent scope adds on top

The law sets the floor. A scope that actually prevents disputes goes further, and for a bathroom the fights are always in the same five places.

Existing conditions and intent. Which bathroom, and what it becomes. Hall bath, primary bath, powder room. Whether the shower moves, the tub goes, a wall opens. "New shower" priced in place and "new shower" relocated are different projects with different plumbing, permits, and inspections.

Demolition and protection. Which finishes and fixtures come out, whether walls and flooring are included, who hauls debris, and how adjacent flooring and pathways are protected. Confirm whether final cleanup is in the price.

Plumbing, electrical, mechanical. Supply lines, drains, shutoff valves, shower valve, and fixture locations, named. Lighting, switches, receptacles, exhaust fan, and GFCI protection. Whether a dedicated circuit or a panel review is in scope.

Two code points to hold your contractor to. The 2025 California Mechanical Code section 405.3 requires mechanical exhaust directly outdoors from each room with a bathtub or shower, at not less than 50 cfm intermittent or 25 cfm continuous under 405.3.1. And GFCI protection is required for bathroom receptacles under California Electrical Code 210.8(A). Also note the code cycle: the 2025 Title 24 edition took effect January 1, 2026, and the Energy Code applies based on the date the permit application was submitted, not the construction date.

Substrate and waterproofing. This is where money quietly disappears. The scope should name framing modifications, blocking for grab bars and accessories, the wall substrate, shower pan construction, and the waterproofing system. "Tile shower included" is not a scope. Specify where tile runs, how high, niches, benches, and trim. Flooring, baseboards, wall finish, paint, and ceiling repair listed separately.

Worth knowing: Los Angeles County treats the shower pan as its own inspection line item, "P3 Shower Pan," at the drywall and lath stage (LA County inspection checklist, PDF). The California Plumbing Code requires a water test of shower receptors. Anyone who wants to tile over a pan that has not been tested is telling you something about how they work.

Allowances. Separate contractor-provided materials from your selections, item by item: vanity, countertop, sink, faucet, toilet, shower trim, mirrors, lighting, accessories, tile, grout, paint. Then attach a dollar amount to each category, not one lump "fixture allowance." Confirm in writing what happens when a selection comes in over, and what happens when it comes in under. If a credit is not documented, it does not exist.

Part 3: what the permit actually covers in Los Angeles

Here is the line most homeowners are looking for.

The City of Los Angeles issues a combined permit through its electronic permit system for bathroom work limited to repairing or replacing cabinets, flooring, wall finishes, tile, counters, and plumbing and electrical fixtures only. That combined permit excludes wall changes, new openings, and new plumbing or electrical penetrations into existing walls, which need separate permits obtained at an LADBS Development Services Center (PermitLA bathroom detail).

Translated: a like-for-like refresh is a simple permit. Moving a fixture is not. Relocating a toilet, shower, or vanity means new drain and supply penetrations, which is where the scope, the permit, and the price all change together.

Better news on the plan check side. LADBS Express Permits cover "Kitchen/bathroom remodel for residential buildings (no structural changes)" with no plan check required, along with electrical work up to 400 amps and mechanical equipment well above a bathroom exhaust fan's capacity (Information Bulletin P/GI 2026-003, Express Permits (No Plan Check Required), effective 01-01-2026, revised 06-10-2026, PDF). Express Permit service is available at the Van Nuys Development Services Center, 6262 Van Nuys Blvd, Room 251, open 7:30 AM to 4:30 PM except Wednesday, when it opens at 9:00 AM.

So a typical San Fernando Valley bathroom remodel with no structural change can generally be permitted without a plan check. If a contractor tells you a bathroom permit means months of plan check, ask which structural change they are planning.

What a bathroom remodel costs, for context

The 2025 Cost vs. Value Report, which prices a tightly defined spec project rather than "a bathroom in Sherman Oaks," puts the Los Angeles midrange bath remodel at $27,143 with $24,312 in resale value, recouping 89.6%, and the upscale bath at $85,055 with $35,982 in resale value, recouping 42.3% (JLC, Los Angeles market). Read those as a benchmark for a defined scope, not as a quote. Note there is no 2026 edition yet.

The reason to care about the spread is the same reason to care about the scope. Two proposals at $28,000 and $46,000 are usually not the same project.

Four questions that expose most bad proposals

  1. What exactly is included in demolition, disposal, and protection of the rest of the home?
  2. Which fixtures and finishes are included, and what is the allowance amount for each category?
  3. Who pulls the permit, who meets the inspector, and are permit fees inside the contract price?
  4. How will concealed conditions and homeowner-requested changes be priced and approved, and will I see it in writing before the work happens?

The answers belong in the documents, not in a conversation. A contractor who welcomes these questions during estimating is showing you how the project gets managed after demolition.

Frequently asked questions

Do I need a permit for a bathroom remodel in Los Angeles? For replacing cabinets, flooring, wall finishes, tile, counters, and fixtures in place, yes, but it is a simple combined permit. Wall changes, new openings, and new plumbing or electrical penetrations require separate permits from an LADBS Development Services Center.

How much can a contractor ask for up front in California? $1,000 or 10% of the contract price, whichever is less (B&P 7159.5(a)(3)). After that, no payment may exceed the value of work already performed or materials already delivered. There is a narrow exception for contractors who furnish an approved blanket performance and payment bond.

Does my contractor have to carry general liability insurance? CSLB does not require it. It requires disclosure of whether the contractor carries it, with the carrier name and a verification phone number if they do. Ask, then call the carrier.

Is a verbal change order enforceable? Not reliably. B&P 7159 requires the change order provision and states that a change order is not enforceable unless it identifies the scope of the change, the price adjustment, and the effect on the payment schedule or completion date. Extra work done before written authorization is at the contractor's risk.

Can I cancel after I sign? Three business days for most home improvement contracts, five if you are 65 or older, seven for work on a residence damaged in a declared emergency. Since January 1, 2026 you can send that cancellation by email.

The scope is the protection

The point of a written scope is not paperwork. It is that materials, workmanship, timing, and decisions all have one shared reference point before your house becomes a construction site.

EMR Heritage sends a free written estimate range within two business days of your request, and an itemized written scope within 2 business days of the on-site design consultation. Both are free. Detailed plans and permit work are paid.

Request a bathroom remodel estimate range

Reference documents worth keeping: CSLB sample home improvement contract, PDF and Terms of Agreement, CSLB's consumer guide, PDF.

Planning a project in the Valley or Santa Clarita?

Tell us about it online and get a free written estimate range within 2 business days, before anyone comes to your house.

CallTextFree Estimate