Almost every list of how to choose an ADU contractor in Los Angeles says the same four things: check the license, get three bids, read reviews, get it in writing. True, and not enough. The ADU contractors who actually finish on schedule in Los Angeles are the ones who can answer questions about your specific lot before they quote it, and who know which of the four LADBS paths your project is on.
Here is what to ask, and what a real answer sounds like.
Do they know which permit path your ADU is on?
Los Angeles does not have one ADU process. It has several, and the one you land on sets your timeline.
- The ADU Standard Plan Program. LADBS maintains approved standard ADU plans. Building from one shortens plan check substantially, at the cost of design freedom. LA County Public Works runs its own Pre-Approved ADU Standard Plans program for unincorporated areas.
- Counter Plan Check or Expanded Counter Plan Check. Reviewed at the counter for simpler and mid-sized projects.
- Regular Plan Check. Full review for larger or more complex work.
A contractor who cannot tell you which of these your project fits, and why, has not looked at your lot.
Do they know the 60-day rule?
Under Government Code 66317(a)(3), a local agency must approve or deny a complete ADU or JADU application within 60 days of receiving it. Under 66317(a)(2)(A) it has 15 business days to tell you in writing whether your application is complete.
That clock only starts on a complete application. This is the single most useful question you can ask: what makes an application complete in my jurisdiction, and who is responsible for getting it there? A contractor who has run this process will answer in specifics. One who has not will talk about the 60 days as though it starts when they hit submit.
Do they know what your lot triggers?
Los Angeles lots carry conditions that do not show up in a generic ADU quote:
- Hillside. Grading, access, retaining and fire access requirements change the cost structure entirely.
- Historic Preservation Overlay Zone. Design review adds time and constraints.
- Very High Fire Hazard Severity Zone. Exterior assemblies and defensible space requirements change.
- Sewer capacity and route. How far and at what slope your new drain has to travel to a legal tie-in.
- Panel and service capacity. A load calculation question, not a guess.
- Easements and setbacks. What you can build where.
Ask which of these apply to your address. If the answer arrives without anyone having pulled up your parcel, the number attached to it is decoration.
Do they understand the utility connection rule correctly?
Under Government Code 66324(d), an ADU created within an existing structure cannot be required to install a new or separate utility connection, and no related connection fee or capacity charge may be imposed. Under 66324(e), a new detached ADU can be required to have one, with fees proportionate to the burden. Impact fees may not be imposed on an ADU under 750 square feet.
Contractors get this wrong in both directions. Some quote a connection fee that cannot legally be charged on a conversion. Some promise no fees at all on a new detached build. Correct on this point is a decent proxy for correct elsewhere.
The paperwork checks, quickly
| Check | Where | What you are looking for |
|---|---|---|
| License number and classification | CSLB license lookup | Active, correct class, name matches the contract exactly |
| Bond | CSLB record | The $25,000 bond under B&P 7071.6, in force |
| Workers compensation | CSLB record | Coverage or a valid exemption |
| Complaint history | CSLB record | Disclosable complaints and discipline |
| Contract contents | The proposal | Everything B&P 7159 requires, in writing |
| Down payment | The proposal | No more than $1,000 or 10 percent, whichever is less |
| Who pulls the permit | The proposal | The contractor, in the contractor name |
That last row is not administrative. If you are asked to pull the permit as an owner-builder, you are being asked to take on the legal responsibility of the builder.
Questions that separate a bid from a number
- Which permit path is my ADU on, and why that one?
- What is missing today that would make my application incomplete?
- What did you find on my parcel that changes the price?
- What is excluded from this number?
- What are the allowances, and what do they buy?
- Who is the design professional and who holds their contract?
- What is the trade list, with classifications?
- What is the payment schedule tied to, milestones or dates?
- What does your warranty cover, and for how long, in writing?
FAQ
How long does an ADU permit take in Los Angeles? The agency has 60 days to approve or deny a complete application under Gov Code 66317(a)(3), and 15 business days to tell you whether it is complete. Getting to complete is the part that varies, and it is where most of the calendar goes.
Do pre-approved ADU plans save real time? Yes, on plan check. LADBS runs an ADU Standard Plan Program and LA County runs a Pre-Approved ADU Standard Plans program. You trade design flexibility for review speed.
Do I need a Class B general contractor for an ADU? An ADU involves multiple unrelated trades, which is exactly what B&P 7057 describes for a Class B general building contractor. Single-trade specialists cannot take the whole project.
Should I choose the lowest ADU bid? Compare exclusions before you compare totals. The lowest number is usually the one that left the most out.
What deposit is legal for an ADU contract in California? $1,000 or 10 percent of the contract price, whichever is less.
Related reading
- How to choose a San Fernando Valley ADU builder
- Junior ADU eligibility requirements in California, 2026 rules
Talking to EMR
EMR Heritage Build Co. is a licensed California Class B general contractor, CSLB #1156160, working in the San Fernando Valley, Santa Clarita and Los Angeles. Every project starts with a free written estimate range, then an itemized written scope with inclusions, exclusions and allowances after the on-site consultation. Permits are pulled in the contractor name, trade partners are licensed and insured, and changes move only on a signed change order. No verbal deals, and every claim on this page is one you can check.